Consultancy work undertaken |
(1) |
Name of Project |
: Environmental Impact Assessment on Kukule Hydro power project |
|
Project Country |
: Sri Lanka |
|
Duration |
: 1992-1993 |
|
Employer |
: University of Moratuwa |
|
Source of fund |
: CEB |
|
Position/responsibility held |
: Environmental Engineer |
|
Assignments performed |
: Prepared in detail EIA report consisting of the existing situation, impacts, mitigation required and monitoring plan for environmental elements such as water quality, noise and vibration, air quality and solid waste and hazardous waste management. |
|
|
|
|
|
|
(2) |
Name of Project |
: Environmental Impact Assessment on proposed southern highway |
|
Project Country |
: Sri Lanka |
|
Duration |
: 1996-1997 |
|
Employer |
: Road Development Authority |
|
Source of fund |
: Asian Development Bank |
|
Position/responsibility held |
: Environmental Engineer |
|
Assignments performed |
: Prepared in detail EIA report consisting of the existing situation, impacts, mitigation required and monitoring plan for environmental elements such as water quality, noise and vibration, air quality and solid waste and hazardous waste management. |
|
|
|
|
|
|
(3) |
Name of Project |
: Monitoring of water quality in Port of Colombo and Beira Lake |
|
Project Country |
: Sri Lanka |
|
Duration |
: 1996-2002 |
|
Employer |
: Japan Port Consultants |
|
Source of fund |
: Japan Bank for International Cooperation |
|
Position/responsibility held |
: Environmental Expert |
|
Assignments performed |
: Monthly monitoring of port and the lake was carried out. A report on the results was prepared. And emergency situation were too monitored |
|
|
|
|
|
|
(4) |
Name of Project |
: Environmental Impact Assessment on 18 hole golf course at Muthurajawela |
|
Project Country |
: Sri Lanka |
|
Duration |
: 1998 |
|
Employer |
: Environmental Resources Management Ltd |
|
Source of fund |
: ditto |
|
Position/responsibility held |
: Environmental Engineer |
|
Assignments performed |
: Prepared in detail EIA report consisting of the existingsituation, impacts, mitigation required and monitoring plan for environmental elements such as water quality, noise and vibration, air quality and solid waste and hazardous waste management. |
|
|
|
|
|
|
(5) |
Name of Project |
: Environmental Improvement Study, Port of Colombo |
|
Project Country |
: Sri Lanka |
|
Duration |
: 1998-1999 |
|
Employer |
: World Bank |
|
Source of fund |
: World Bank |
|
Position/responsibility held |
: Team Leader/Environmental Engineer |
|
Assignments performed |
: Environmental status report on the Port of Colombo and its surrounding was prepared. All necessary detailed studies on water and sediment quality were undertaken. Recommendations for improvement of harbour basin were proposed. |
|
|
|
|
|
|
(6) |
Name of Project |
: Environmental Impact Assessment on the barge mounted power plant in Port of Colombo |
|
Project Country |
: Sri Lanka |
|
Duration |
: 1999 |
|
Employer |
: Environmenral Resources Management Ltd |
|
Source of fund |
: ditto |
|
Position/responsibility held |
: Environmental Engineer |
|
Assignments performed |
: Prepared in detail EIA report consisting of the existing situation, impacts, mitigation required and monitoring plan for environmental elements such as water quality, noise and vibration, air quality and solid waste and hazardous waste management. |
|
|
|
|
|
|
(7) |
Name of Project |
: Environmental Impact Assessment on the proposed Southern Corridor Transport Project |
|
Project Country |
: Sri Lanka |
|
Duration |
: 1999 |
|
Employer |
: Road Development Authority |
|
Source of fund |
: Asian Development Bank |
|
Position/responsibility held |
: Environmental Engineer |
|
Assignments performed |
: Prepared in detail EIA report consisting of the existing situation, impacts, mitigation required and monitoring plan for environmental elements such as water quality, noise and vibration, air quality and solid waste and hazardous waste management |
|
|
|
|
|
|
(8) |
Name of Project |
: Development of Environmental Noise Standards for Sri Lanka |
|
Project Country |
: Sri Lanka |
|
Duration |
: 1999-2000 |
|
Employer |
: Environmental Management Lanka Limited |
|
Source of fund |
: World Bank |
|
Position/responsibility held |
: Noise Specialist |
|
Assignments performed |
: The existing legislation was reviewed and updated. New guidelines were developed. A novel approach was followed in developing draft environmental noise legislation. |
|
|
|
|
|
|
(9) |
Name of Project |
: Initial Environmental Examination on Flour Mill project, Port of Colombo |
|
Project Country |
: Sri Lanka |
|
Duration |
: University of Moratuwa |
|
Employer |
: 2000 |
|
Source of fund |
: ditto |
|
Position/responsibility held |
: Environmental Engineer |
|
Assignments performed |
: Prepared in detail EIA report consisting of the existing situation, impacts, mitigation required and monitoring plan for environmental elements such as water quality, noise and vibration, air quality and solid waste and hazardous waste management. |
|
|
|
|
|
|
(10) |
Name of Project |
: Environmental Impact Assessment on Lionvent Diesel power plant |
|
Project Country |
: Sri Lanka |
|
Duration |
: 2000 |
|
Employer |
: Lanka Hydraulics Institute |
|
Source of fund |
: ditto |
|
Position/responsibility held |
: Environmental Engineer |
|
Assignments performed |
: Prepared in detail EIA report consisting of the existing situation, impacts, mitigation required and monitoring plan for environmental elements such as water quality, noise and vibration, air quality and solid waste and hazardous waste management. |
|
|
|
|
|
|
(11) |
Name of Project |
: Environmental Impact Assessment for the development of the Galle port as a regional Port |
|
Project Country |
: Sri Lanka |
|
Duration |
: 2000-2001 |
|
Employer |
: Engineering Consultants Limited |
|
Source of fund |
: Sri Lanka Ports Authority |
|
Position/responsibility held |
: Environmental Expert |
|
Assignments performed |
: Worked as a specialist on environmental issues pertaining to development of Port of Galle . All environmentally sensitive issues were addressed with contingency plan. Recommendations were strongly proposed for implementation. |
|
|
|
|
|
|
(12) |
Name of Project |
: Urgent Development of Galle port as a regional Port |
|
Project Country |
: Sri Lanka |
|
Duration |
: 2000-2001 |
|
Employer |
: Japan Port Consultants |
|
Source of fund |
: Japan International Coorporation Agency |
|
Position/responsibility held |
: Environmental Expert/ JICA member |
|
Assignments performed |
: Worked as a specialist on environmental issues pertaining to development of Port of Galle . All environmentally sensitive issues were addressed with contingency plan. Recommendations were strongly proposed for implementation. |
|
|
|
|
|
|
(13) |
Name of Project |
: Feasibility Study of South Harbour Development; Port of Colombo |
|
Project Country |
: Sri Lanka |
|
Duration |
: 2000-2001 |
|
Employer |
: Maunsell , Australia |
|
Source of fund |
: Asian Development Bank |
|
Position/responsibility held |
: Environmental Expert |
|
Assignments performed |
: The water quality, noise and air quality issues pertaining to the development of fishery harbour were studied. Report incorporating impacts, mitigation measures and monitoring plan was prepared. |
|
|
|
|
|
|
(14) |
Name of Project |
: Coastal Resources Management Project |
|
Project Country |
: Sri Lanka |
|
Duration |
: 2002-2004 |
|
Employer |
: Anzdec Pvt. Ltd., New Zealand |
|
Source of fund |
: Asian Development Bank |
|
Position/responsibility held |
: Water Quality Specialist |
|
Assignments performed |
: Selected coastal belt of Sri Lanka were monitored for water quality for a period of two years. Based on the results, action plan was prepared. New chapter on coastal pollution control for the coastal resources management plan was prepared. |
|
|
|
|
|
|
(15) |
Name of Project |
: Drainage plan for the proposed southern highway project |
|
Project Country |
: Sri Lanka |
|
Duration |
: 2003 |
|
Employer |
: Road Development Authority |
|
Source of fund |
: Asian Development Bank |
|
Position/responsibility held |
: Water Quality Specialist |
|
Assignments performed |
: All the water bodies covering the proposed highway were checked for water quality. Their compliance with different designated uses was compared. Recommendations to improve water quality were proposed. |
|
|
|
|
|
|
(16) |
Name of Project |
: Master Plan for the improvement of development initiatives for the Kaduwela Pradesheeya Sabah |
|
Project Country |
: Sri Lanka |
|
Duration |
: 2003-2004 |
|
Employer |
: Ministry of Urban Public Utilities |
|
Source of fund |
: Ministry |
|
Position/responsibility held |
: Environmental Expert |
|
Assignments performed |
: Environmental aspects such as ground water quality, surface water quality, air quality noise and vibration were studied and presented using GIS maps. The necessary mitigation measures were incorporated. |
|
|
|
|
|
|
(17) |
Name of Project |
: Efficiency Improvement and capacity enhancement of JCT; Port of Colombo |
|
Project Country |
: Sri Lanka |
|
Duration |
: 2004 |
|
Employer |
: Japan Port Consultants |
|
Source of fund |
: Japan International Coorporation Agency |
|
Position/responsibility held |
: Environmental Engineer |
|
Assignments performed |
: Environmental aspects of the Port of Colombo were studied for efficiency improvement at JCT terminals. A report giving all necessary measures for efficiency improvement was developed. |
|
|
|
|
|
|
(18) |
Name of Project |
: Initial Environmental Examination on Kalametiya Fishery Harbour |
|
Project Country |
: Sri Lanka |
|
Duration |
: 2004 |
|
Employer |
: Teams Pvt. Ltd. |
|
Source of fund |
: Asian Development Bank |
|
Position/responsibility held |
: Environmental Specialist |
|
Assignments performed |
: The water quality, noise and air quality issues pertaining to the development of fishery harbour were studied. Report incorporating impacts, mitigation measures and monitoring plan was prepared. |
|
|
|
|
|
|
(19) |
Name of Project |
: Initial Environmental Examination on Hikkaduwa Fishery Harbour |
|
Project Country |
: Sri Lanka |
|
Duration |
: 2004 |
|
Employer |
: Teams Pvt. Ltd |
|
Source of fund |
: Asian Development Bank |
|
Position/responsibility held |
: Environmental Specialist |
|
Assignments performed |
: The water quality, noise and air quality issues pertaining to the development of fishery harbour were studied. Report incorporating impacts, mitigation measures and monitoring plan was prepared. |
|
|
|
|
|
|
(20) |
Name of Project |
: Initial Environmental Examination on Chilaw Fishery Harbour |
|
Project Country |
: Sri Lanka |
|
Duration |
: 2004 |
|
Employer |
: Teams Pvt. Ltd |
|
Source of fund |
: Asian Development Bank |
|
Position/responsibility held |
: Environmental Specialist |
|
Assignments performed |
: The water quality, noise and air quality issues pertaining to the development of fishery harbour were studied.Report incorporating impacts, mitigation measures and monitoring plan was prepared. |
|
|
|
|
|
|
(21) |
Name of Project |
: Coastal Resources Management Project |
|
Project Country |
: Sri Lanka |
|
Duration |
: 2004 |
|
Employer |
: Acadis Company, The Netherlands |
|
Source of fund |
: Asian Development Bank |
|
Position/responsibility held |
: Environmental Engineer |
|
Assignments performed |
: Water quality of selected lagoons, estuaries and coastal water bodies were studied. Reports on each of them were prepared together with their implementation program for restoration from water pollution. |
|
|
|
|
|
|
(22) |
Name of Project |
: Detail designs of South Port Development, Port of Colombo |
|
Project Country |
: Sri Lanka |
|
Duration |
: 2004-2005 |
|
Employer |
: Scott Wilson Pvt. Ltd., United Kingdom |
|
Source of fund |
: Asian Development Bank |
|
Position/responsibility held |
: Environmental Specialist |
|
Assignments performed |
: The detailed design pertaining to environmental aspects were studied. The plans for proper construction and development of new port in Colombo with less environmental damage were made. Environmental management plans were developed for implementation during construction phase. |
|
|
|
|
|
|
(23) |
Name of Project |
: Development of land use plan for Southern region |
|
Project Country |
: Sri Lanka |
|
Duration |
: 2004-2005 |
|
Employer |
: Surath Wickramasighe Associates Pvt. Ltd. |
|
Source of fund |
: Department of Physical Planning |
|
Position/responsibility held |
: Environmental Specialist |
|
Assignments performed |
: Environmental profiles of Galle , Matara, Hambantota, Ratnapura and Monaragala districts were developed. The present environmental degradation problems and their restoration were studied. Land use maps incorporating environmental sensitive areas were developed. |
|
|
|
|
|
|
(24) |
Name of Project |
: Supplementary Study on Tsunami Affected Galle Port |
|
Project Country |
: Sri Lanka |
|
Duration |
: May - July 2005 |
|
Employer |
: Japan Port Consultants, Japan |
|
Source of fund |
: Japan International Co-orporation Agency |
|
Position/responsibility held |
: Environmental Specialist |
|
Assignments performed |
: The environmental aspects of existing Galle Port basin were studied. The changes that have taken place due to tsunami waves were investigated. The mitigation required for the restoration of basin was proposed. Environmental Management plan was prepared. |
|
|
|
|
|
|
(25) |
Name of Project |
: Restoration of tsunami hit areas in Amparai District and fishery harbours |
|
Project Country |
: Sri Lanka |
|
Duration |
: May-July 2005 |
|
Employer |
: CH2MHILL, United States of America |
|
Source of fund |
: ditto |
|
Position/responsibility held |
: Environmental Specialist |
|
Assignments performed |
: Environmental improvements to be done on fishery harbours were studied in detail. Recommendations to restore their environment were proposed. Design details on development of breakwaters were studied. |
|
|
|
|
|
|
(26) |
Name of Project |
: EIA for the post tsunami rehabilitation of the fishery harbours at Hikkaduwa, Puranawella (Dondra) and Mirissa |
|
Project Country |
: Sri Lanka |
|
Duration |
: 2005 |
|
Employer |
: UASID |
|
Source of fund |
: USAID |
|
Position/responsibility held |
: Environmental Engineer |
|
Assignments performed |
: Prepared in detail EIA report consisting of the existing situation, impacts, mitigation required and monitoring plan for environmental elements such as water quality, noise and vibration, air quality and solid waste and hazardous waste management |
|
|
|
|
|
|
(27) |
Name of Project |
: Environmental Rapid Assessment (Brown Study) on tsunami affected areas |
|
Project Country |
: Sri Lanka |
|
Duration |
: Feb-May 2005 |
|
Employer |
: Ministry of Environment and Natural Resources |
|
Source of fund |
: United Nations Environmental Program |
|
Position/responsibility held |
: Team Leader/Environmental Specialist |
|
Assignments performed |
: Pollution taken place as a result of tsunami in Sri Lanka was assessed in all areas with measurements wherever possible. Final report was done with measures to be implemented in order to restore the environmental degradation. |
|
|
|
|
|
|
(28) |
Name of Project |
: Study on control of noise levels at David Pieris Motor Company showroom at Battaramulla |
|
Project Country |
: Sri Lanka |
|
Duration |
: Aug-Dec 2005 |
|
Employer |
: David Pieris Motor Company |
|
Source of fund |
: From the company |
|
Position/responsibility held |
: Noise Control Specialist |
|
Assignments performed |
: Excessive noise emanating from the generator was studied with measurements. A proper attenuation program was designed and implemented. |
|
|
|
|
|
|
(29) |
Name of Project |
: Supplementary Environmental Impact Assessment for southern corridor project |
|
Project Country |
: Sri Lanka |
|
Duration |
: 2005-2006 |
|
Employer |
: Road Development Authority |
|
Source of fund |
: Asian Development Bank |
|
Position/responsibility held |
: Environmental Engineer |
|
Assignments performed |
: Prepared in detail EIA report consisting of the existing situation, impacts, mitigation required and monitoring plan for environmental elements such as water quality, noise and vibration, air quality and solid waste and hazardous waste management |
|
|
|
|
|
|
(30) |
Name of Project |
: Pre-feasibility and Feasibility study for Hambantota Sea Port |
|
Project Country |
: Sri Lanka |
|
Duration |
: Jul 2005 to Mar 2006 |
|
Employer |
: Ramboll International Ltd., Denmark |
|
Source of fund |
: Sri Lanka Ports Authority |
|
Position/responsibility held |
: Environmental Specialist |
|
Assignments performed |
: All the physical and chemical aspects of environment were studied in detail. Existing situation, impacts, mitigation required and monitoring plan for environmental elements such as water quality, noise and vibration, air quality and solid waste and hazardous waste management have been studied. Final part of the environmental aspects of the entire feasibility was prepared. |
|
|
|
|
|
|
(31) |
Name of Project |
: EIA and pre-feasibility study on engineered land fill at Kaduwela |
|
Project Country |
: Sri Lanka |
|
Duration |
: Nov 2005 to Apr 2006 |
|
Employer |
: Abans Pvt. Ltd |
|
Source of fund |
: From the company |
|
Position/responsibility held |
: Team Leader/Solid Waste Management Specialist |
|
Assignments performed |
: EIA and preliminary works on land selection, geotechnical investigation and other environmental aspects were studied. The details of solid waste management principles were too studied. Conceptual plan and methodology was developed. All the preliminaries required for approvals from different agencies were carried out. |
|
|
|
|
|
|
(32) |
Name of Project |
: Environmental Impact Assessment for Hideaway Hotel located in an island of Madu Ganga |
|
Project Country |
: Sri Lanka |
|
Duration |
: Dec 2005 to Mar 2006 |
|
Employer |
: Aitken Spence Hotels (Pvt) Ltd. |
|
Source of fund |
: From the company |
|
Position/responsibility held |
: Environmental Specialist |
|
Assignments performed |
: Prepared in detail EIA report consisting of the existing situation, impacts, mitigation required and monitoring plan for environmental elements such as water quality, noise and vibration, air quality and solid waste and hazardous waste management |
|
|
|
|
|
|
(33) |
Name of Project |
: Environmental restoration of the tsunami hit Karagan Lewaya, Hambantota |
|
Project Country |
: Sri Lanka |
|
Duration |
: Dec 2005 to Mar 2006 |
|
Employer |
: Water and Sanitation Delegate of US Red Cross and International Federation of Red Cross Societies |
|
Source of fund |
: Water and Sanitation Delegate of US Red Cross and International Federation of Red Cross Societies |
|
Position/responsibility held |
: Team Leader/Environmental Engineer |
|
Assignments performed |
: Investiagted the effects of tsunamis on the water and sediment quality and anticipated impacts as well as appropriate environmental management options |
|
|
|
|
|
|
(34) |
Name of Project |
: EIA for the proposed Colombo-Kandy Highway ; 5 road traces and OCH Section |
|
Project Country |
: Sri Lanka |
|
Duration |
: Year 2006 |
|
Employer |
: Road Development Authority |
|
Source of fund |
: Road Development Authority |
|
Position/responsibility held |
: Environmental Engineer |
|
Assignments performed |
: Prepared in detail EIA report consisting of the existing situation, impacts, mitigation required and monitoring plan for environmental elements such as water quality, noise and vibration, air quality and solid waste and hazardous waste management as water quality, noise and vibration, air quality and solid waste and hazardous waste management |
|
|
|
|
|
|
(35) |
Name of Project |
: Environmental Impact Assessment for a hotel with chalets located in a couple of islands of Madu Ganga |
|
Project Country |
: Sri Lanka |
|
Duration |
: April-June 2006 |
|
Employer |
: Mr. Rahal Wijesuriya |
|
Source of fund |
: From the client |
|
Position/responsibility held |
: Environmental Specialist |
|
Assignments performed |
: Prepared in detail EIA report consisting of the existing situation, impacts, mitigation required and monitoring plan for environmental elements such as water quality, noise and vibration, air quality and solid waste and hazardous waste management as water quality, noise and vibration, air quality and solid waste and hazardous waste management |
|
|
|
|
|
|
(36) |
Name of Project |
: Rapid Environmental Assessment on permanent housing scheme constructed for Tsunami affected families |
|
Project Country |
: Sri Lanka |
|
Duration |
: April-August 2006 |
|
Employer |
: Ministry of Environment |
|
Source of fund |
: Ministry of Environment |
|
Position/responsibility held |
: Environmental Engineer |
|
Assignments performed |
: A questionnaire was developed to investigate the likely problems faced by people of permanent houses done for tsunami affected areas. The same developed was filled in for the districts of Matara and Hambantota and the existing environment, likely anticipated impacts and their mitigation measures were discussed. |
|
|
|
|
|
|
(37) |
Name of Project |
: Environmental Impact Assessment for Hambantota Sea Port |
|
Project Country |
: Sri Lanka |
|
Duration |
: May-July 2006 |
|
Employer |
: Central Engineering Consultancy Bureau |
|
Source of fund |
: Sri Lanka Ports Authority |
|
Position/responsibility held |
: Environmental Engineer |
|
Assignments performed |
: Prepared in detail EIA report consisting of the existing situation, impacts, mitigation required and monitoring plan for environmental elements such as water quality, noise and vibration, air quality and solid waste and hazardous waste management. |
|
|
|
|
|
|
(38) |
Name of Project |
: Design and construction of domestic water treatment plant for a leisure park at Attidiya |
|
Project Country |
: Sri Lanka |
|
Duration |
: Jan 2006 to Feb 2007 |
|
Employer |
: Attidiya Wet Park (Pvt) Ltd |
|
Source of fund |
: From the company |
|
Position/responsibility held |
: Wastewater Specialist |
|
Assignments performed |
: An eco-friendly concept consisting of grease traps, septic tanks, anaerobic filters and constructed wetlands has been proposed. Detail designs and subsequent construction have been done. The final effluent quality is to be met with permissible levels stipulated by Central Environmental Authority for discharge to water courses. |
|
|
|
|
|
|
(39) |
Name of Project |
: Design and construction of industrial water treatment plant for the removal of tannin from coir fiber processing plant |
|
Project Country |
: Sri Lanka |
|
Duration |
: May 2006 to Jan 2007 |
|
Employer |
: Growrite Substrate (Pvt) Ltd |
|
Source of fund |
: From the company |
|
Position/responsibility held |
: Wastewater Specialist |
|
Assignments performed |
: A plant using physico-chemical treatment technology has been designed. A lab scale experiment was performed and subsequently prototype was designed. The construction was done at the site and it is to be used for the removal of tannin from the coir fibers processing factory. About 150 cubic meters will be treated at the plant. |
|
|
|
|
|
|
(40) |
Name of Project |
: Management of water supply schemes and wastewater plants at Heritans Hotel |
|
Project Country |
: Sri Lanka |
|
Duration |
: Mar 2006 to Jul 2006 |
|
Employer |
: Aitken Spence Hotel Limited |
|
Source of fund |
: From the company |
|
Position/responsibility held |
: Environmental Consultant |
|
Assignments performed |
: Analyzed the existing plants in terms of water quality measurements and design of proper treatment unit processes; The lab scale operations are experimented and finally pilot scale prototypes are designed. |
|
|
|
|
|
|
(41) |
Name of Project |
: Management of water supply schemes and wastewater plants at Kandalama Hotel |
|
Project Country |
: Sri Lanka |
|
Duration |
: Mar 2006 to Jul 2006 |
|
Employer |
: Aitken Spence Hotel Limited |
|
Source of fund |
: From the company |
|
Position/responsibility held |
: Environmental Consultant |
|
Assignments performed |
: Analyzed the existing plants in terms of water quality measurements and design of proper treatment unit processes; The lab scale operations are experimented and finally pilot scale prototypes are designed. |
|
|
|
|
|
|
(42) |
Name of Project |
: EIA for the 300 MW power plant project at Kerawalapitiya for Lakdhanavi Limited |
|
Project Country |
: Sri Lanka |
|
Duration |
: Nov 2006 |
|
Employer |
: Lakdhanavi Limited |
|
Source of fund |
: Lakdhanavi Limited |
|
Position/responsibility held |
: Environmental Engineer |
|
Assignments performed |
: Prepared in detail EIA report consisting of the existing situation, impacts, mitigation required and monitoring plan for environmental elements such as water quality, noise and vibration, air quality and solid waste and hazardous waste management. |
|
|
|
|
|
|
(43) |
Name of Project |
: Feasibility of Dutch Bay Hotel Complex, Kalpitiya |
|
Project Country |
: Sri Lanka |
|
Duration |
: Jan 2006 to Mar 2007 |
|
Employer |
: Dutch Bay Hotels Ltd. |
|
Source of fund |
: Dutch Bay Hotels Ltd. |
|
Position/responsibility held |
: Environmental Engineer |
|
Assignments performed |
: Prepared the detailed environmental aspects of the areas Including water supply, wastewater treatment, power generation, surface water and ground water pollution activities, noise control and air pollution control measures |
|
|
|
|
|
|
(44) |
Name of Project |
: Strategic Environmental Assessment for landfills in Hambantota District |
|
Project Country |
: Sri Lanka |
|
Duration |
: Mar 2006 to Jan 2007 |
|
Employer |
: Central Environmental Authority |
|
Source of fund |
: Central Environmental Authority |
|
Position/responsibility held |
: Team Leader |
|
Assignments performed |
: Prepared the site selection criteria for the engineered landfills taking in to account social, physical and ecological aspects of the environment |
|
|
|
|
|
|
(45) |
Name of Project |
: Strategic Environmental Assessment for Development of Metro-Trincomalee Area |
|
Project Country |
: Sri Lanka |
|
Duration |
: Jan 2007 to Apr 2007 |
|
Employer |
: Central Environmental Authority |
|
Source of fund |
: Central Environmental Authority |
|
Position/responsibility held |
: Environmental Engineer |
|
Assignments performed |
: Prepared the report on noise, air pollution aspects that are likely to be affected due to proposed zoning |
|
|
|
|
|
|
(46) |
Name of Project |
: Feasibility of Waste to Energy projects for Sri Lanka |
|
Project Country |
: Sri Lanka |
|
Duration |
: Jan 2007 to Dec 2007 |
|
Employer |
: Green Solution Investment Ltd, Australia |
|
Source of fund |
: Project funds |
|
Position/responsibility held |
: Environmental Engineer |
|
Assignments performed |
: Prepared the feasibility reports based on the right model applicable to Sri Lanka |
|
|
|
|
|
|
(47) |
Name of Project |
: Strategic Environmental Assessment for Development of Dedduwa as a tourist area |
|
Project Country |
: Sri Lanka |
|
Duration |
: Jan 2008 to May 2008 |
|
Employer |
: MG Consultants Pvt Ltd |
|
Source of fund |
: Sri Lanka Tourist Board |
|
Position/responsibility held |
: Environmental Engineer |
|
Assignments performed |
: Prepared a report on the impacts of water, air and noise that are likely to be affected due to said development |
|
|
|
|
|
|
(48) |
Name of Project |
: Environmental pollution control in S&D Associates Pvt Ltd |
|
Project Country |
: Sri Lanka |
|
Duration |
: May 2008 to Jan 2009 |
|
Employer |
: S&D Associates Pvt. Ltd |
|
Source of fund |
: Company |
|
Position/responsibility held |
: Environmental Engineer |
|
Assignments performed |
: Carried out a comprehensive pollution control work at the factory premises |
|
|
|
|
|
|
(49) |
Name of Project |
: Environmental Impact Assessment for Moragolla Power plant |
|
Project Country |
: Sri Lanka |
|
Duration |
: Feb 2009 to Oct 2009 |
|
Employer |
: Central Engineering Consultancy Bureau |
|
Source of fund |
: CEB |
|
Position/responsibility held |
: Environmental Engineer |
|
Assignments performed |
: Looked at the impacts, mitigation for likely issues on water, noise, vibration and air due to said projects |
|
|
|
|
|
|
(50) |
Name of Project |
: Initial Environmental Impact Assessment for Dompe Sanitary Landfill |
|
Project Country |
: Sri Lanka |
|
Duration |
: Jul 2009 |
|
Employer |
: Central Environmental Authority |
|
Source of fund |
: CEA |
|
Position/responsibility held |
: Team Leader |
|
Assignments performed |
: Carried out a comprehensive IEE study for the said project |
|
|
|
|
|
|
(51) |
Name of Project |
: Preparation of Environmental Management Plans for the rehabilitation of six dams in Pollonnaruwa and Trincomalee Districts |
|
Project Country |
: Sri Lanka |
|
Duration |
: Feb 2009 to Sep 2009 |
|
Employer |
: Engineering Consultants Ltd |
|
Source of fund |
: World Bank |
|
Position/responsibility held |
: Team Leader |
|
Assignments performed |
: Prepared the EMPs for six dams considering the physical, social and ecological aspects |
|
|
|
|
|
|
(52) |
Name of Project |
: Odour control in Cargills Lanka Pvt Ltd |
|
Project Country |
: Sri Lanka |
|
Duration |
: May 2009 to Sep 2009 |
|
Employer |
: Cargills Lanka Pvt Ltd |
|
Source of fund |
: Company |
|
Position/responsibility held |
: Environmental Engineer |
|
Assignments performed |
: Carried out a comprehensive pollution control work at the Wastewater treatment plant |
|
|
|
|
|
|
(53) |
Name of Project |
: Preparation of Environmental Management Plans for the construction of four new buildings for Vocational Training Centres |
|
Project Country |
: Sri Lanka |
|
Duration |
: Sep 2009 to Jan 2010 |
|
Employer |
: Ministry of Higher Education |
|
Source of fund |
: World Bank |
|
Position/responsibility held |
: Team Leader |
|
Assignments performed |
: Prepared the EMPs for four different sites considering the physical, social and ecological aspects |
|
|
|
|
|
|
(54) |
Name of Project |
: Preparation of Environmental Monitoring Plan for the proposed Trincomalee Industrial Zone |
|
Project Country |
: Sri Lanka |
|
Duration |
: Dec 2009 to Mar 2010 |
|
Employer |
: Trincomax Industries Pvt Ltd |
|
Source of fund |
: Trincomax Industries Pvt Ltd |
|
Position/responsibility held |
: Team Leader |
|
Assignments performed |
: Prepared the background monitoring plans for the selected locations |
|
|
|
|